Main Content

Below are the public involvement technical memorandums prepared for various roadway projects in Lee County.

The short version of each report contains a summary of the workshop, summarized comments received as a result of the workshop and the Lee County DOT’s response to the public comment.

The long version of each report includes the summary of the workshop and all of the appendices, including copies of all public comment submitted. Opening the long version may take an extended period of time due to the file size.

Upcoming public workshops will be listed on this page as they are scheduled.


 Public Workshop Memorandum

 

Luckett Road. /
Sunshine Blvd.
Corridor Alignment Study   Long version
Meadow Road Access Road to State Road 82. Short version  
Sanibel Causeway Value (Variable) Pricing Study Short version  
Alico Road Connector Technical Memorandum   Long version
Burnt Store Road
Widening Project
Pine Island Road to
Kismet Parkway
  Long version
Treeline Avenue Pelican Preserve Entrance
to Daniels Parkway
Short version Long version
Sandy Lane Extension Corridor Alignment Study Short version Location Map
Summerlin Road /
San Carlos Blvd.
Overpass Short version Long version
Three Oaks Parkway
Widening
Corkscrew Rd. to Alico Rd. Short version Long version
Summerlin Road
Six-Laning Design
San Carlos Blvd. to
Gladiolus Dr.
Short version Long version
Koreshan Boulevard
Extension
Three Oaks Pkwy. to
Ben Hill Griffin Pkwy.
Short version Long version
Three Oaks Parkway Southerly Alignment Study Short version Long version
Plantation / Palmetto Extension Idlewild St. to Abbott St. Short version Long version
Plantation / Palmetto
Corridor
Six Mile Cypress to
Colonial Blvd.
Short version Long version
Bonita Beach Road
Widening
West of I-75 to Mango St.   Long version
Ortiz Avenue Right-of-Way Alignment Study Martin Luther King Blvd. to
Palm Beach Blvd.
  Long version
Summerlin Road
Six-Laning Design
Boy Scout Drive to
Cypress Lake Drive
Short version Long version